CONSULTING ENGINEERS
PROJECT MANAGEMENT
DESIGN - CONSTRUCT
Protecting Perth's drinking water supply as a challenge overcome by APM. The client undertook the expansion of mining operations in the Perth hills water catchment area. This required hydrocarbon capture and separation from storm and process water. APM undertook the design and construction of the process system including environmental certification to the EPA WA. Design and construction included process, civil, mechanical, piping, electrical, instrumentation and control.