CONSULTING ENGINEERS
PROJECT MANAGEMENT
DESIGN - CONSTRUCT
After experiencing storm surge damage APM provided structural engineering inspection and reporting services to the client for the Fremantle Port under jetty walk way system at the Kwinana Bulk Jetty in Cockburn Sound. APM then prepared a structural re-design including Tekla BIM shop drawings to expedite fabrication and installation of the remediation work.